Welcome

Cart My cart 0 Items
Download PDF

Application

To be used for installing crossbars between two channels 27 or as base unit for projecting channels.

 

Note: When assembling version MH as cantilever, consider sufficient bracing of the channel. In case of tension load Fz at channel slot, screws must be displaced.

 

Scope of delivery

Completely assembled. Installation Position the channel into the U-profile. Click in the speed nut by pushing on the bolt head and tighten with 10 Nm.

 

Technical Data

2710_cc_auslegerk_27_bel_dia01.tif.51317

Adm. anchor loads to be respected.


Max. adm. load for assembly on ceilings  in vertical direction: 0,8 kN.


1354_Auslegerkons_Grafik.2352.tif.9311.p

Material: Steel, electro-galvanised.

= Sold by pack
Type
kg
Pack.
Avail.
Art.Cod.
Price
Q.ty